Publications

Dr. V. Kazakidis

Journals

Cardin, M.A., de Neufville R., and Kazakidis, V.N., (2008), A Process to Improve Expected Value of Mining Operations”, Mining Technology, (IMM  A), Inst. of Materials, Minerals and Mining, UK., No 2, pp. 65-70.

Kenzap, S.A. and Kazakidis, V.N., (2008), "Quality Cost Assessment in Mine Tunnelling with Drilling and Blasting", Int. J. of Mineral Resources Engineering, Vol. 12, No. 3, pp. 161-177.

Kenzap, S.A., Peloquin, L.J. and Kazakidis, V.N. (2007), "Use of Discrete-Event Simulation for Evaluation of Quality in Hard Rock Mine Lateral Development", Int. J. of Mineral Resources Engineering, Vol. 12, No. 1, pp. 49-72.

Mayer Z. and Kazakidis, V., (2007), “Decision Making in Flexible Mine Production System Design Using Real Options”, Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 2,  February, pp. 169-180.

Dessureault, S., Kazakidis, V., and Mayer, Z., (2007), “Flexibility Valuation in Operating Mine Decisions using Real Options Pricing”, International Journal of Risk Assessment and Management (IJRAM), InderScience Pbs., Vol. 7, No. 5, pp., 656-674

Kazakidis, V.N., and Dessureault, S. (2004), "Incorporating Ground Delays in Underground Mine Production System Simulation", SME Transactions, Society for Mining, Metallurgy and Exploration, USA, Vol. 316, pp. 51-57.

Kazakidis, V.N., Mayer, Z. and Scoble, M., (2004), "Decision-Making using the Analytic Hierarchy Process in Mining Engineering", Mining Technology, Inst. of Materials, Minerals and Mining, UK March, Vol. 113, pp. 30-42 (13).

Kazakidis, V.N. and Scoble, M., (2003), "Planning for Flexibility in Underground Mine Production Systems," Mining Engineering, Amer. Inst. Min. Metall. Pet. Eng., SME, 55,8, pp.33-39

Vayenas, N., Kazakidis, V., Scoble, M., and Espley, S. (2003), "Applying a Maintenance Methodology for Excavation Reliability", International Journal of Surface Mining, Reclamation and Environment, Vol. 17, pp. 4-19.

Kazakidis, V., and Scoble, M., (2002), “Accounting for the Impact of Ground-Related Problems in Planning Mine Production Systems”, Mineral Resources Engineering, Vol. 11, No 1, pp. 35-57

Kazakidis, V.N., (2002) "Confinement Effects and Energy Balance Analysis for Buckling Failure under Eccentric Loading Conditions", Rock Mech. & Rock Eng. J., Technical Note, 35 (2), 115-126.

Kazakidis, V.N. (2001), "Stability Assessment in the Design of Underground Mine Openings: A sensitivity Analysis", CIMM Bulletin, Vol. 94, July Forum, pp. 60-64.

Conference Proceedings

D. Cheung, V. Kazakidis, and B. Simser, (2009), “A Methodology to Assess the Vulnerability of Design Alternatives in Burst-Prone Mines”, MPES 2009, Banff, Alberta, November 16-19, 11p.

 

S.A. Kenzap  and V.N. Kazakidis, (2009), Quality Assessment of the Development Cycle with Drilling and Blasting”, Aachen High Performance Mining, AIMS 2009, Aachen, June 3-4, 21 p.

D. Gregory, S. P. Singh, and V. Kazakidis, (2008), “Quality assessment of blast-induced rock mass damage”, ISEE 34th Annual Conference on Explosives & Blasting Technique, New Orleans,  Jan 27-30, 13p. D. Cluff, J. Gallagher, A. Jalbout, V. Kazakidis, and G. Swan, (2008), "Frozen Backfill for Open Stoping in Permafrost", CIM Annual Meeting, Edmonton, May 4-7, 9 p.

D. Cluff, J. Gallagher, A. Jalbout, V. Kazakidis, and G. Swan, (2008), "Frozen Backfill for Open Stoping in Permafrost", CIM Annual Meeting, Edmonton, May 4-7, 9 p.

S. Moutsatsos, Kazakidis, V.N. and Fowler, J. (2007), Linking IBA’s and Project Management – A Case Study”, Int. Conf. on Sustainable Development Indicators in the Mineral Industries, SDIMI, June, Milos, Greece, 7 p.

Kazakidis, V., Swan, G, Campbell, J., Graham, C., (2006), "Towards Cost/Risk Model Driven Project Priorities for Deep Mining Research", Deep Mining & High Stress Mining Seminar, Quebec City, October 4-6, 9p. (DMRC)

Kenzap, S.A., Peloquin, L.J. & Kazakidis, V.N., (2006), “Case studies of quality assessment in lateral development of hard rock mines”, XV International Symposium on Mine Planning & Equipment Selection (MPES 2006), September 20-22, Torino, Italy, 6p. (CRD)

Mayer, Z. and Kazakidis, V., (2005), "Quantifying Operating Flexibility in Mine Planning: A Real Options Approach", Graduate Student Award, CIM Mining Rocks, Toronto, April 24-27, Poster presentation & abstract

Mayer, Z. and Kazakidis, V., (2005), “Quantifying Flexibility in Underground Mining Systems with Uncertain Operating Conditions”, CIM Maintenance Engineering – Mine Operators’ Conference, Feb. 20-23, Sudbury, Ontario, 11p.

Swan, G., Kazakidis, V., Graham, C., (2005), “Deep Mining Research: Implementing Technology to Manage Risk”, CIM Maintenance Engineering – Mine Operators’ Conference, Feb. 20-23, Sudbury, Ontario, 12 p.

Kazakidis, V.N. and Mayer, Z., (2004), “Qualitative Decision-Making in Mineral Resource Industries”, CORS/INFORMS International Meeting, Banff, Alberta, May 16-19.

Kazakidis, V.N., Moutsatsos, S., Haliburton R.F.C., Vagenas, N., (2003), “Sustaining Mining in a Developed World: Shifting the paradigm”, Int. Conf. on Sustainable Development Indicators in the Mineral Industries, SDIMI, May 21-23, Milos, Greece, pp. 67-72.

BACK

 
 
©2012 Laurentian University | Sudbury ON P3E 2C6 | Canada | 705.675.1151 | 1.800.461.4030 | Contact Us| 46° 27′ 52″, -80° 58′ 05″ | Privacy Policy | Terms of Use
Back to top